65 M newly built supply Tug
65 M newly built supply Tug
65 M newly built supply Tug 65 M newly built supply Tug (102) 65 M newly built supply Tug (101) 65 M newly built supply Tug (100) 65 M newly built supply Tug (99) 65 M newly built supply Tug (98) 65 M newly built supply Tug (97) 65 M newly built supply Tug (96) 65 M newly built supply Tug (95) 65 M newly built supply Tug (94) 65 M newly built supply Tug (93) 65 M newly built supply Tug (92) 65 M newly built supply Tug (91) 65 M newly built supply Tug (90) 65 M newly built supply Tug (89) 65 M newly built supply Tug (88) 65 M newly built supply Tug (87) 65 M newly built supply Tug (86) 65 M newly built supply Tug (85) 65 M newly built supply Tug (84) 65 M newly built supply Tug (83) 65 M newly built supply Tug (82) 65 M newly built supply Tug (81) 65 M newly built supply Tug (80) 65 M newly built supply Tug (79) 65 M newly built supply Tug (78) 65 M newly built supply Tug (77) 65 M newly built supply Tug (76) 65 M newly built supply Tug (75) 65 M newly built supply Tug (74) 65 M newly built supply Tug (73) 65 M newly built supply Tug (72) 65 M newly built supply Tug (71) 65 M newly built supply Tug (70) 65 M newly built supply Tug (69) 65 M newly built supply Tug (68) 65 M newly built supply Tug (67) 65 M newly built supply Tug (66) 65 M newly built supply Tug (65) 65 M newly built supply Tug (64) 65 M newly built supply Tug (63) 65 M newly built supply Tug (62) 65 M newly built supply Tug (61) 65 M newly built supply Tug (60) 65 M newly built supply Tug (59) 65 M newly built supply Tug (58) 65 M newly built supply Tug (57) 65 M newly built supply Tug (56) 65 M newly built supply Tug (55) 65 M newly built supply Tug (54) 65 M newly built supply Tug (53) 65 M newly built supply Tug (52) 65 M newly built supply Tug (51) 65 M newly built supply Tug (50) 65 M newly built supply Tug (49) 65 M newly built supply Tug (48) 65 M newly built supply Tug (47) 65 M newly built supply Tug (46) 65 M newly built supply Tug (1) 65 M newly built supply Tug (45) 65 M newly built supply Tug (44) 65 M newly built supply Tug (43) 65 M newly built supply Tug (42) 65 M newly built supply Tug (41) 65 M newly built supply Tug (40) 65 M newly built supply Tug (39) 65 M newly built supply Tug (38) 65 M newly built supply Tug (37) 65 M newly built supply Tug (36) 65 M newly built supply Tug (35) 65 M newly built supply Tug (34) 65 M newly built supply Tug (33) 65 M newly built supply Tug (32) 65 M newly built supply Tug (31) 65 M newly built supply Tug (30) 65 M newly built supply Tug (29) 65 M newly built supply Tug (28) 65 M newly built supply Tug (27) 65 M newly built supply Tug (26) 65 M newly built supply Tug (25) 65 M newly built supply Tug (24) 65 M newly built supply Tug (2) 65 M newly built supply Tug (3) 65 M newly built supply Tug (4) 65 M newly built supply Tug (5) 65 M newly built supply Tug (6) 65 M newly built supply Tug (7) 65 M newly built supply Tug (8) 65 M newly built supply Tug (9) 65 M newly built supply Tug (10) 65 M newly built supply Tug (11) 65 M newly built supply Tug (12) 65 M newly built supply Tug (13) 65 M newly built supply Tug (14) 65 M newly built supply Tug (15) 65 M newly built supply Tug (16) 65 M newly built supply Tug (17) 65 M newly built supply Tug (18) 65 M newly built supply Tug (19) 65 M newly built supply Tug (20) 65 M newly built supply Tug (21) 65 M newly built supply Tug (22) 65 M newly built supply Tug (23)

65 M newly built supply Tug


65 m newly built supply Tug

GENERAL SPECIFICATIONS

Launching /Built Completion 2013/2015 in Malaysia
Class ABS=A1 + AMS + FIFI1 + Oil Recovery Class 1 + OSV AH + ACCU + DPS2 + SPS
Gross Tonnage 2,235 T
Deadweight 1,500T
Length O A 65.00 M
Molded Breadth 16.00 M
Molded Depth 6.20 M
Design Draft 5.00 M

PERFORMANCE

Service Speed (85% MCR) 12.5 Knots @ 5.20 M Draft
Bollard Pull 80 T
CARGO CAPACITIES
Cargo Deck Area 435 M2
Deck Cargo 600 T
Deck Strength 7 T/M2
Fuel Oil 590.204 M3 (100%)
Fresh Water 476.323 M3 (100%)
Water Ballast/ Drill Water 728.962 M3 (100%)
Dry Bulk 150 M3 (100%)
Brine/ORO 463.726 M3 (100%)
Foam 21.079 M3 (100%)
Dispersant 21.079 M3 (100%)
Mud 380.244 M3 (100%)
Sewage 15.805 M3 (100%)
F.O Overflow 21.076 M3 (100%)
Dirty Oil 13.172 M3 (100%)
Bilge Holding 13.172 M3 (100%)
Hyd. Oil 4.003 M3 (100%)
AELO 12.616 M3 (100%)
MELO 12.616 M3 (100%)
Rig Chain Lockers 2 Nos. (Each for 220 m long, 36mm Chain)CARGO PUMPS DISCHARGE CAPACITIES
Fuel Oil Cargo 1 x 150m3/hr @ 70M (ITUR ILN 80/250B VERTICAL
CENTRIFUGAL PUMP)
Fresh Water Cargo 1 x 100m3/hr @ 70M (ITUR ILN 65/250 VERTICAL CENTRIFUGAL
PUMP)
Drill/Ballast 3 x 100m3/hr @ 70M (ITUR ILN 65/250 VERTICAL CENTRIFUGAL
PUMP)
Mud / Brine 2 x 70m3/hr @ 70M (ALLWEILER SPH1450.2H11 P11G 113XP
ECCENTIC SCREW PUMP)
Dry Bulk 13m3/min at 5.6kg/cm2 (max 7.0kg/cm2) x 2 Nos, Dryer
16.0m3/min x 2 Nos (AIRMAN)

EXTERNAL FIRE FIGHTING SPECIFICATIONS

FiFi Class 1 2 x 1,725 m3/hr Pump, 2 x 1,200 m3/hr Water/Foam Monitors,
Local & Remote Controls incl.
Joystick, Foam Liquid Inductor, Water Spray, Oil Dispersant
System (FIRE FIGHTING SYSTEM)
Foam System 2 x Adjustable Foam Inductor, 0~6% Mixing Ratio/ 150 L/min.
(FIRE FIGHTING SYSTEM)
Emergency Fire Pump 1 x 45m3/hr @ 60M Pump (DESMI S80-70-275N SELF PRIMING
PUMP)

OIL RECOVERY & DISPERSANT SYSTEM SPECIFICATIONS

Oil Recovery System (Containerized.) Inflatable Sweeping arm with an integrated skimmer, 2 x 70M3/hr
discharge pumps (ITUR)
Dispersant System 2 x 6 M Oil Dispersant Boom Assembly, 10 x 3/4″ Dispersant
Nozzle (FIRE FIGHTING SYSTEM)

LIFE SAVING EQUIPMENT & FIRE FIGHTING APPLIANCES

Fast Rescue Boat & Davit No x 6 men, 25 Hp Mercury Outboard Engine, SAD14 Davit
13.5KN (SWL) x 4.0m (WEST MARINE)
Life Rafts 6 x 25 Men Inflatable Life Rafts (CSM)
LSA As per SOLAS requirements.
Fire Fighting Internal Fire Detection System, CO2 System, Water Mist System, Galley
Hood Fire System(FITECH)
Other Rescue Zones, BA Sets, Gas Detectors, Stretcher, Hospital

ACCOMMODATION – 50 PERSONS

One Man Cabin 6 Cabins
Two Men Cabin 4 Cabins
Four Men Cabin 9 Cabins
Toilets with Shower All Cabins, Main Deck & Hospital (FW Hot Water Supply)
Mess / Recreation Room Big Hall, separate areas for Officers and Crew.
Others Office/ Meeting Room, Hospital with Toilet & Bath Tub, Freezer &
Chiller, Provision Store, Deck
Store, Linen Store x 2, Changing Room, Oil Skin, Laundry

WHEEL HOUSE SPECIFICATIONS

DP System K-Pos DP-21, IMO Class 2 (KONGSBERG)
DP Function Sensor System Data Processing, Position-Reference System Data
Processing, Position-Reference System Functions, Thruster
Allocation/ Control, Power Load Monitoring and Blackout
Prevention
Joystick Cjoy Independent Three-axis Joystick System (KONGSBERG)
Reference Systems 3 x Gyro Compass, 3 x Wind Sensor, 2 x MRU, 2 x DPS 110, 1 x
CyScan Mk4 Laser, 2 x DP
OS, 1 x Printer, 1 x DPC-2, 2 x UPS, 1 x Mode Selector Switch (KONGSBERG)
Navigational 1 x Cassens & Plath Magnetic Reflector Compass, 1 x Anschutz
Autopilot, 3 x Anschutz Gyro
Compass, 1 x Furuno Radars, 1 x Furuno Echo Sounder 200KHz,
1 x Furuno Doppler Speed Log, 3 x Furuno DGPS, 3 x RM Young
Anemometer, 4 x Hanseatic Clinometer, 2 x Hanseatic Barometer,
1 x Furuno Automatic Identification System, 1 x Furuno Weather
Fax Receiver, 1 x Furuno Bridge Navigational Watch Alarm System (FURUNO)
Communication/ Data 1 x Vingtor Public Address/ Talkback System, 1 x Vingtor Internal
Automatic Telephone Systems, 1 x Furuno Navtex Receiver, 1 x
McMurdo EPIRB, 1 x McMurdo SART, 1 x TV Antenna, Speakers(FURUNO)
Search Lights 3 x IP56 Halogen Search Light, Remote Controlled,
2000W/50Hz/AC230V (IMAC)
Wipers 2 x AFT Straightline Wiper, 2 x FWD Straightline Wiper (BOHAMET, POLAND)
Air Horn 1 x 24VDC Air Horn (MARCO)
Air Conditioning 2 x 24,000 btu/hr Floor Standing Type (MIDEA)

PROPULSION SPECIFICATIONS

Main Engine 2 x 3,393BHP @900RPM Caterpillar Engine Model: C280-8, Tier II (CATERPILLAR)
Reduction Gear Box 2 x Reintjes Reduction Gearbox, ratio 4.916:1, Vertical Offset (REINTJES)
Propulsion 2 x Dia. 3,000mm x 4 Blades Propeller in Kort Nozzles (BERG PROPULSION)
Steering Gear 2 x Kobelt Independent Hydraulic Steering System (RIQ)
Rudder 2 x 13m2 FC High Type Lift Flap Rudder (WEST MARINE)
Shaft Generators 2 x 1,100 KW, 415 V, 50 Hz (STAMFORD)
Main Generators 3 x 450 KW @1,500RPM Caterpillar Generator Model: C18, Tier II (CATERPILLAR)
Emergency Generator 1 x 118KW @1,500RPM Caterpillar Generator Model: C6.6, Tier II (CATERPILLAR)
Bow Thrusters 2 x 540KW @1,500RPM Thruster Model: BTT315 (BERG PROPULSION)
Stern Thruster 1 x 540KW @1,500RPM Thruster Model: BTT315 (BERG PROPULSION)

DECK MACHINERY ELECTRO – HYDRAULIC

Anchor Handling/Towing Winch 1 x Winch (MACGREGOR)
Drum Capacity 1,200 M x Dia. 60mm SWR @10 Layers
Brake Holding 250 T (Static, 1st Layer)
Rated Pull (1st Layer) 150 T @ 6M/min, 75 T @ 12M/min, 25 T @30M/min.
Anchor Windlass/ Mooring Winch 2 x Winches(MACGREGOR)
Chain Size U3, Dia. 36mm Chain (MEP)
Duty Pull 10 T @ 9M/min
Drum Capacity 180 M x Dia. 40mm PP Rope @ 6 Layers
Brake Holding 20 T (Static, 1st Layer)
Rated Pull (1st Layer) 6 T @ 15M/min
Shark Jaw & Angular Tow Pins 1 x 300 T Shark Jaw & Angular Tow Pins (MACGREGOR)
Controls Local & Remote Controls in Bridge.
Tugger Winch 2 x Winches, 250 M x Dia. 22mm SWR @ 8 Layers (MACGREGOR)
Brake Holding 15 T (Static, 1st Layer)
Rated Pull (1st Layer) 10 T @ 15M/min (1st Layer)
Gob Eye 85 T SWL
Towing Bollard 80 T SWL
Stern Roller 250 T SWL
Storage Reel Winch 1 x Winch, 1200 M x Dia. 60mm SWR @ 11 Layers (MACGREGOR)
Capstan 2 x 10 T @ 15 M/min
Deck Crane 1 x 2.5 T x 14M(L) SWL Hiab 401L Hyd. Knuckle Boom Telescopic Type MACGREGOR/ HIAB)
Anchor & Mooring 2 x 1,575 KG HHP Anchors, 2 x 36mm Roller Type Chain Stoppers, 2 x 8
shots U3 36mm chain cable 27.5M(L), Mooring Lines (MEP)

MISCELLANEOUS SPECIFICATIONS

Unmanned Alarm Monitoring System 1 x Norimos 3000 Intergrated Alarm and Monitoring System (NORIS)
Fresh Water Generator 1 x 10 T/Day c/w UV Sterilizer System 2.7m3/hr (PETSEA)
Oily Water Separator 1 x Hension 1.0m3/hr (ACG)
Flow Meters 2 x F.O and FW. Local & Remote Display (PASIFIC)
Purifiers 1 x 1,500 L/H Kakoki Kaisha Self Cleaning Purifier c/w Automatic Control
(MITSHUBISHI)
Air Conditioning (Main Unit) 1 x Bitzer Open Type Compressor & Condenser 1,014,000 btu/hr, R-407c
(BORNEO MARINE)
Air Conditioning (ECR) 1 x 39,000 btu/hr
Air Handling 1 x MAHK-1911L
Refrigeration (Chiller & Freezer) 2 x Bitzer Semi Hermetic Compressor & Condenser, R-404a (BORNEO
MARINE)
Servicing/ Air Compressor 1 x NAX-11AR, 119m3/hr@7 Bar Air Compressor c/w 300L Receiver Tank
(DONGHWA)
Engine Starting 2 x LHC-33, 18.5m3/hr@30 Bar Air Compressor c/w 300L Receiver Tank
(TECO)
Fresh Water Calorifier 1 x 1,000 Litres Fresh Water Calorifier (SAMKUN)
Sewage Treatment Plant 1 x 58 Men Sewage Treatment Plant (JONGHAP)
Main Switch Board 1 x 415V AC 3P3W MSB c/w PMS, ACCU, DPII (NORIS)
Bilges & Ballast Valves System 1 x Norismo 3000 Valve Control System c/w Electric Driven Valves (NORIS)
Tank Gauging Remote Gauging with alarms for all main tanks with displays in Bridge &
E.C.R (NORIS)
Galley Equipments 2 x Cooking Range c/w Exhaust Hood, 1 x stainless steel chiller, 1 x waste
disposer, 1 x electric heated soup/rice boiler, 1 x microwave oven, 1 x
dishwashing machine, 1 x steaming cabinet, 1 x universal cooling machine,
1 x electric water boiler, 1 x waste compactor, 1 x stainless steel sink table,
1 x bain marie (The Galley Architect, Kang Li)
Interior Design (Wet Unit, Panelling, Ceiling, Doors, Tiles, Rubber carpet) Hailu Marine System (Marine Interior Design,
Marc-Plan)
Mud System 6 x Electrical Drive Mud Agitator for 3 mud tanks (PARSON)
Pressure Set 3 x 3.5M3/Hr x 40M pump (ITUR)
Dirty Oil/ Sludge 1 x 5M3/Hr @ 45M pump (ITUR)
Bilge 2 x 45M3/Hr @ 30M pump (ITUR)
Fuel Oil Transfer 2 x 15M3/Hr @ 20M pump (ITUR)
Information supplied in good faith but without guarantee subject to availability
Location: Malaysia

Reference Number
Asking Price12.000.000 Euros
BuilderJMB malaysia
Yacht Availabilityavailable
Length overall65 meters
Hull Material
Built2015
Refit
Beam16
Max Draft620
Base Port
Maximum Speed
Flag
Crew Cabins1
Guest Capacity1
Cabins1

Machinery & Electronics

Main Engines
Engine Hours
Power Generators
Fuel Capacity
Fresh Water

Make an Offer now



Luxury Yacht Charter Luxury Yacht Charter Dear All, We would like to take this opportunity to welcome you to the Akasia Yachting website. We are very excited to see that you are interested in our luxury yacht charter services as well as buying or building a...
Luxury Yacht Charter, Luxury Yacht Charter Luxury Yacht Charter Luxury Yacht Charter Akasia Yachting is dedicated to serving the blue water industry as a leading luxury yacht charter and management company based in Fethiye, Turkey, offering luxury yacht charter services with TYBA...

© Copyright 2024 akasiayachting.com